Discover a service package crafted just for you. Share insights about your business, and we'll swiftly return with a personalized proposal to elevate your success
Project Overview:
The Jebal Ohud Lighting project, in collaboration with Zain, encompassed an array of comprehensive consultancy and infrastructure deployment services, covering civil works, fiber optic and power infrastructure, lighting design and installation, and the integration of network and CCTV equipment. This case study outlines the seamless collaboration and execution of various elements that culminated in a sophisticated and efficient lighting network, bolstered by robust surveillance and connectivity solutions.
Consultancy Services & Infrastructure Design:
The project included the complete design of High-Level Design (HLD) and Low-Level Design (LLD), layouts, and necessary infrastructure requirements including civil works, fiber optic infrastructure, and power infrastructure.
- Civil Works: Meticulous planning of the civil infrastructure ensured robust support for the comprehensive deployment of lighting poles, fiber optic cabling, and associated power infrastructure.
- Fiber Optic Infrastructure: The detailed scope involved the design and implementation of a comprehensive fiber optic infrastructure to support a wide array of connected devices and systems across a vast geographic area.
- Fiber Optic Cables: The project encompassed the full lifecycle of fiber optic cabling, including supply and installation, covering a cable pulling scope of 71 kilometers, 3,000 splices, and comprehensive testing.
- Lighting Poles: Installation of 189 lighting poles, comprising both decorative and conventional poles, complete with lighting fixtures, and lamps, ensuring comprehensive illumination coverage across the designated area.
- Network and CCTV Equipment Installation: The extensive infrastructure deployment included the design and installation of iPower Outdoor Cabinets, active equipment such as switches, media converters, controllers, etc., and the deployment of both fixed and PTZ CCTV cameras.
Implementation Success & Enhanced Infrastructure:
1. Seamless Deployment: The project's success hinged on the seamless deployment of critical infrastructure elements, ensuring interconnectivity between lighting, surveillance, and networking components.
2. Robust Connectivity: The meticulous deployment of fiber optic infrastructure and power systems has allowed for robust and efficient communication and lighting control across the extended area.
3. Comprehensive Surveillance: The integration of network and CCTV equipment ensures a comprehensive surveillance network covering critical areas, enhancing security and monitoring capabilities.
4. Scalability & Reliability: The infrastructure design allows for future expansion and adaptability, ensuring scalability and reliable performance.
Conclusion:
The Jebal Ohud Lighting project has highlighted the successful collaboration and execution of various infrastructure elements to bring forth a sophisticated lighting network integrated with robust surveillance and connectivity solutions. The seamless deployment of diverse infrastructure components and the meticulous design and integration of lighting and surveillance systems has resulted in a robust and efficient network that stands as a testimony to meticulous planning and execution in the realm of urban infrastructure and security.